Products Categories

Otis MCB-Ⅲ motherboard GCA26800KF1

Otis MCB-Ⅲ inverter motherboard GCA26800KF1 From-Zhuye, Full Supply Chain For Otis, Kone, Schindler, Mitsubishi, Thyssenkrupp Elevator Lift  and Escalator All Brand Spare Parts

Share:

Description

Otis MCB-Ⅲ inverter motherboard GCA26800KF1 Brief introduction

Product     Name

Otis MCB-Ⅲ inverter motherboard

Model Number

 GCA26800KF1

 Quality
Original.Brand New
Payment
T/T. Paypal. Western Union
Delivery
3-5 Working Days 
Packaging
Packed by carton
Otis MCB-III Motherboard GCA26800KF1 – Setup, Integration & Replacement Guide
Nanjing Zhuye Elevator Parts – OEM stock, global shipping, 24/7 support
The GCA26800KF1 is the 32-bit Power-PC heart of every Otis MCB-III controller shipped since 2016. Mounted on the main rack, this board hosts the 400 MHz CPU that runs the SIL-3 safety task, manages real-time CAN traffic, stores 90 days of fault logs and still provides spare Ethernet for Otis REM remote monitoring. A single brown-out on the 24 V rail or a cracked CAN transceiver will throw a “7x” fault and shut the entire group down. Nanjing Zhuye Elevator Parts keeps hundreds of factory-flashed GCA26800KF1 motherboards in Rotterdam and Nanjing so you can restore full traffic the same shift. Below is an 800-word field manual that explains correct usage, on-site programming and the replacement cycle that keeps your elevators secure, connected and code-compliant.

1. What the GCA26800KF1 does

  • 400 MHz Power-PC 5200 with dual CAN, RS-485 and 10/100 Ethernet PHY
  • 512 MB NAND flash for event logs, 64 MB DDR for real-time tasks
  • Dual-redundant safety CPU (external via SPA) achieving SIL-3 / PLe Cat. 3
  • Battery-backed RTC and 256-bit AES encryption for REM cloud link
  • UL/CE listed to EN 81-20/50 and CSA B44.1 for 15-year design life

2. Tools to carry

  • GCA26800KF1 motherboard (Nanjing Zhuye part #OT-MCB3-GCA26800KF1) in anti-static bag
  • 2 mm & 3 mm flat screwdrivers, TX10 Torx
  • Otis Service Tool (OST) laptop with MCB-III 7.x licence key
  • RJ-45 and USB-to-CAN adapters (shielded)
  • Multi-meter with min/max capture
  • Lock-out / tag-out kit

3. Installation – 30 minutes if you back-up first

Safety: place all cars on group inspection, open the main disconnect and verify 0 V on the 24 Vdc rail.
  1. Photograph every J-number jumper – especially J8 (safety version) and J15 (REM enable).
  2. Remove six TX10 screws; slide the old board out of the card guides.
  3. Transfer the micro-SD card (firmware + car parameter file) and the CR2032 battery.
  4. Insert the new GCA26800KF1; torque screws to 1.0 N·m.
  5. Re-connect flat cables J1 (power), J2 (CAN-A), J3 (CAN-B), J4 (SPA), J7 (Ethernet).
  6. Apply power – STATUS LED blinks green 3 times then solid; ETH LED flashes during DHCP.
  7. Launch OST → Controller → Parameter Upload; select the XML back-up created earlier.
  8. Run SIL-3 safety verification – must show 100 % pass.
  9. Remove inspection, run 5 full-speed cycles and log the serial number in CMMS.

4. Functional test – prove it to the inspector

a) Safety string continuity: <0.1 Ω across XSA1-XSA2.
b) CAN-A/B error frames: <1 % during 30 min run.
c) Ethernet ping to REM gateway: <50 ms, 0 % loss.
d) Battery voltage: 3.0 V ±0.1 V; low-battery LED off.
e) Export OST report and attach PDF to site file.

5. Preventive maintenance schedule

  • Monthly – visual sweep for swollen capacitors or corroded CAN terminals.
  • Quarterly – measure 24 Vdc ripple (<100 mV) and case temperature (<55 °C).
  • Annually – export fault log; clear buffers after review.
  • Every two years – replace CR2032 battery and apply latest cybersecurity patch via OST.

6. Replacement cycle – environment decides

Otis specification: 15 years. Nanjing Zhuye analytics refine this:
  • Light duty (<150 starts/day, HVAC room): 18 years
  • Standard duty (150–400 starts, residential): 15 years
  • Heavy duty (>400 starts, hospital, mall): 12 years
  • High ambient (>45 °C, rooftop cabinet): 10 years – capacitor life halves every 10 °C rise.
Replace immediately if:
  • STATUS LED red double-blink – dual CAN failure
  • Ethernet port unresponsive – lightning-damaged PHY
  • RTC loses time <24 h – battery leakage corroding pads
  • Fault buffer shows “NVRAM error” – flash wear-out after 100 k writes

7. Eco-disposal & warranty

Return the old board in the prepaid anti-static box; Nanjing Zhuye recovers gold, copper and aluminium and issues a €15 recycling credit. Every GCA26800KF1 ships with a 24-month replacement warranty, extendable to 60 months when you join our annual battery-and-patch program.

8. Why buy from Nanjing Zhuye Elevator Parts

  • 450 units in stock, Rotterdam & Nanjing, flashed with latest cybersecurity firmware
  • Factory-sealed Otis packaging with hologram and serial database – no grey-market clones
  • QR code on box links to parameter template and 5-minute swap video
  • 24/7 technical hotline staffed by ex-Otis commissioning engineers
  • Bundle pricing: buy 5 boards and get a free CR2032 battery kit plus freight credit

9. Bottom line

A red-status motherboard is the fastest way to a building-wide shutdown. Keep a genuine, pre-flashed GCA26800KF1 on every truck, swap it in 30 minutes, and your elevators will stay safe, connected and compliant for the full 15-year design cycle. Order today from Nanjing Zhuye Elevator Parts – the fastest route from “fault code” to “perfect traffic.”
Otis MCB-Ⅲ motherboard3
Otis MCB-Ⅲ motherboard3
Otis MCB-Ⅲ motherboard2
Otis MCB-Ⅲ motherboard2
Otis MCB-Ⅲ motherboard1
Otis MCB-Ⅲ motherboard1
Otis MCB-Ⅲ motherboard
Otis MCB-Ⅲ motherboard

GET A QUOTE